Sample · Customized Seattle DADU Feasibility Report · $149

Two real Seattle DADU feasibility reports, in full

Both are the $149 feasibility report exactly as it arrives, each run on a real Seattle parcel. One lot gets a YES — 39 pages ending in a straight answer. The other gets CONDITIONAL, because something on it makes a straight answer impossible. Nothing is mocked up and no figure is illustrative.

Download the 39-page YES sample Download the 40-page CONDITIONAL sample Open the interactive version Run this on my address — $149

Two lots, two answers — read this first

Both are published in full, each on a real Seattle parcel, with the address withheld on every page along with the parcel number. Neither is a customer’s report; no customer’s report is ever published here.

Greenwood/Phinney Ridge · 7,620 sq ft · NR · 39 pages. A 2 bed / 1 bath, ~1,000 sq ft detached ADU appears feasible on this lot: it fits the measured clear zone, sits 0 sq ft under the 1,000 sq ft cap, and no critical-area designation applies. Score 86/100 (“Promising”), confidence high. Measured clear zone 68 × 39.5 ft, with 4 tree crowns over the lot; the lot abuts an alley, so a crew and a utility trench can reach the back of it. YES — the straight answer
Licton Springs · the site owner’s own lot · 40 pages. a detached unit is already under construction on this lot under permit 7132938-CN — so every slot, lot-coverage, floor-area and density conclusion downstream depends on what that unit turns out to be, and the report refuses to print a plain yes until it is confirmed. CONDITIONAL — the complicated one

Neither is “the typical answer”, because there isn’t one — the verdict is whatever your lot’s measurements produce. These are all of the answers it can return:

  • YES
  • YES, WITH CONDITIONS
  • YES, SMALLER
  • CONDITIONAL
  • NOT AS PROPOSED
  • NOT AS A NEW DETACHED UNIT
  • UNCLEAR

The awkward lot is published on purpose, and it is the owner’s own. A sample chosen only to look good tells a buyer nothing about what happens when their lot turns out to be complicated — which is the case a buyer most needs to see before paying.

The YES report, as it prints

3 pages from the Greenwood/Phinney Ridge lot — the cover carrying the verdict, and the pages the measurements are drawn on. All 39 are in the PDF.

A page from the YES sample Seattle DADU feasibility report
From the 39-page YES sample
A page from the YES sample Seattle DADU feasibility report
From the 39-page YES sample
A page from the YES sample Seattle DADU feasibility report
From the 39-page YES sample

The CONDITIONAL report, as it prints

3 pages from the Licton Springs lot, as they print. All 40 are in the PDF — download it or read it in the browser.

A page from the CONDITIONAL sample Seattle DADU feasibility report
From the 40-page CONDITIONAL sample
A page from the CONDITIONAL sample Seattle DADU feasibility report
From the 40-page CONDITIONAL sample
A page from the CONDITIONAL sample Seattle DADU feasibility report
From the 40-page CONDITIONAL sample

What each of the 13 chapters answers

Typically 35–40 pages — this sample is 40, because the length depends on the lot’s hazards, trees, recorded permits and available imagery.

The answer on one page: the verdict, the facts that decided it, and what would change it.Executive Summary
Lot size measured from the parcel polygon, what is already standing, and the permit history recorded against the address.Property Overview
The zone, the code sections that govern a detached ADU in it, and the dimensional standards they set.Regulatory Framework
Critical areas and protected trees clipped to your parcel — steep slope, landslide, liquefaction, peat, flood, wetland — not to your neighborhood.Site Constraints & Hazards
Street frontage, alley status, and how a crew and a utility trench would actually reach the back of the lot.Site Access
The measured clear rectangle left after setbacks, lot coverage and tree protection, drawn on the site diagram it was measured on.Buildable Area Analysis
Two paths side by side: a pre-approved standard plan, and a custom design fitted to the measured zone.Concept Schemes
Permit, review and utility-connection fees, each one marked as an official figure or a planning estimate.Government Fees: What It Costs
What a second unit does to the assessment, and what Washington law does and does not allow on selling it separately.Property Tax & Separate Sale (Washington)
The review path SDCI would put this through, and elapsed times measured on comparable Seattle permits.Permitting: How Long It Takes
The next steps in sequence, with the ones that must happen before any design spend at the top.Action Items: What to Do, in Order
Every record, map layer and code section used, by name and date, so any figure on any page can be traced back.References / Source Index
How the score on the cover is built, and which findings move it.Feasibility Score Methodology

What the markers mean

Every claim in the report carries one of three marks, so you always know whether you are reading a record or a projection.

The zone, the lot size, a recorded permit number — things read straight from a City or County record, or measured from the parcel polygon.★ — official record or measured figure
Fee bands, timelines, anything projected. The report tells you to confirm these before you rely on them.◇ — planning estimate to validate
What you asked us to test — the unit size and bedroom count you gave at checkout.● — your own input

Imagery is named too: Mapbox Satellite for measurement and USDA NAIP orthoimagery as the fallback. Measurement is never done on Google imagery.

What this report will not tell you

Written here rather than in the small print, because a buyer who needs one of these is better off knowing now.

  1. 1

    It is not a land survey

    Boundaries come from the City parcel polygon, not from a surveyor’s pins. Dimensions are approximate.

  2. 2

    It is not engineering or architectural design

    No structural, geotechnical or drainage design, and no drawings you could submit.

  3. 3

    It is not legal, tax or lending advice

    The Washington property-tax and separate-sale chapter explains the mechanics; it is not advice about your situation.

  4. 4

    It is not a City determination

    Not a ruling by SDCI or King County, and no guarantee of permit approval. Rules and fees change.

  5. 5

    Title is not verified and the site is not visited

    Easements, covenants and title are outside its scope, and nobody walks the lot.

  6. 6

    It measures the lot — it does not hand you the documents

    The scanned deeds, the SPU side-sewer card, the microfilm permits and the heating-oil tank paperwork are a different product: the Seattle Property Records Dossier, $13.99, with its own sample.

Run this on your own Seattle address

Same engine, same chapters, your parcel — delivered within 24 hours after a person reviews it. Seattle addresses only; an address outside the city limits is refused before any payment is taken.

Customized Feasibility Report — $149 Property Records Dossier — $13.99

Questions people actually ask

Is this the report I would receive?

Yes — both of these are the $149 Customized Seattle DADU Feasibility Report exactly as it is delivered, on real Seattle parcels. Typically 35–40 pages; these are 39 and 40, because the length depends on what the lot turns up.

Why does one sample say YES and the other say CONDITIONAL?

Because the two lots are different, and the verdict is whatever the measurements produce. On the Greenwood/Phinney Ridge lot: a 2 bed / 1 bath, ~1,000 sq ft detached ADU appears feasible on this lot: it fits the measured clear zone, sits 0 sq ft under the 1,000 sq ft cap, and no critical-area designation applies. The score is 86/100 and the confidence is high. On the other lot — the site owner's own — a detached unit is already under construction on this lot under permit 7132938-CN, which changes every slot, coverage, floor-area and density conclusion downstream until that unit's identity is confirmed, so the report will not print a plain yes. Nothing was tuned to make either answer come out the way it did.

Whose properties are these?

The CONDITIONAL one is the site owner's own lot, in Licton Springs. The YES one is a real third-party Greenwood/Phinney Ridge lot, published as GIS-derived facts only. On both, the address and parcel number are withheld throughout, and no customer's report is ever published.

Is this the same thing as the Property Records Dossier?

No, and they are easy to confuse. This report measures what your lot allows for a backyard cottage. The Property Records Dossier ($13.99) does not measure anything — it collects the documents already on file for your address, including the scanned deeds, the side-sewer card, the microfilm permits and the heating-oil tank paperwork. Different products, different samples.

What will it not tell me?

It is not a land survey, not an engineering or architectural design, and not legal, tax or lending advice. It is not a determination by SDCI or King County and does not guarantee permit approval. Easements, covenants and title are not verified, and the site is not physically inspected.

Keep reading before you spend anything

The requirements themselves, in the order SDCI applies them.Can I build a backyard cottage in Seattle?
The numbers the buildable rectangle in Chapter 6 comes from.Seattle DADU setback requirements
What the report’s fee chapter is estimating against.Seattle DADU cost in 2026
Your own area, measured: lot sizes, slope and canopy.18 Seattle neighborhood profiles
DADU feasibility report — $149 Open it